Nuclear

Position your business against the £36.6bn committed to a single nuclear project.

UK nuclear new-build, financing and supply-chain intelligence.

One volume on this sector, twelve findings, every figure traced to a named primary source and carried at a stated verification date. We read the National Wealth Fund commitments, the GBE-Nuclear allocation and the RAB financing framework so that you do not have to. Scroll down to see what is in it.

The problem

£36.6bn is committed to Sizewell C. £2.5bn sits behind everything else.

The National Wealth Fund committed £36.6 billion to Sizewell C; GBE’s capital allocation is £2.5 billion.

The root cause

Why now? Great British Nuclear became GBE-Nuclear on 16 May 2025, with £2.5bn of capital behind it.

A public-finance stack for nuclear that did not exist in 2020.

The turn

One volume, twelve findings, every figure from a named source.

The pipeline, the two financing routes, and the cross-volume anchors into grid and investment.

Proof

£36.6bn from the National Wealth Fund. £2.5bn from GBE. Both traced to named commitments.

Where a figure is a projection it is labelled as one, and every finding carries a confidence level.

What you get

Check which financing route a project is using before you price the risk into your bid.

Track the GBE-Nuclear capital allocation against what has actually been drawn down.

Read the twelve findings with their confidence levels, rather than a headline from a press release.

See how the nuclear pipeline connects to the grid and investment volumes you already read.

The quality of the consultancy support has been excellent. They took the time to understand our requirements rather than offering an off-the-shelf solution, and worked closely with our project team throughout. We would have no hesitation in working with them again.
Richard EvansConstruction Manager · Keltbray
Volumes in this sector

The single volume in this sector frames the next decade of UK nuclear capital deployment, supplier positioning windows and Generic Design Assessment milestone gates.

Watch this sector live on the boards — the Heatmap for its projects, the Data Board for its targets against delivery.

Gap 32

UK Nuclear New-Build — Sizewell, Wylfa, Bradwell + the SMR Pipeline.

Read excerpt →Buy · £295

Open any volume and you get consultancy-grade depth: twelve findings, headline figures, the Director's Six-Check, a glossary of named entities (Sizewell C, Hinkley Point C, EDF, Rolls-Royce SMR, Holtec, GE-Hitachi, Sheffield Forgemasters), the £36.6 bn NWF contingency-draw modelling framework, the AUKUS naval nuclear context. deep report PDF + two-page Crib Sheet + quarterly Currency Addendum.

Get started

£295 single volume · £995 annual subscription: one named reader — the full multi-volume catalogue, every new volume released during the year, and subscriber briefing extras. Team £2,495/yr (up to 10 named readers) · Enterprise £4,995/yr (whole company, up to 250 employees) · Corporate £9,995/yr (above 250 employees).

Ask us

Email a specialist.

Tell us what you're bidding for, or which sector you're watching. We'll reply with the report that covers it, or scope a piece of work. 👍

Email us →