MeyGen Tidal Stream Array

  • StageOperating: Phase 1 (6 MW, four 1.5 MW turbines) since March 2018; Phase 2 (59 MW) awarded CfDs in Allocation Rounds 4 to 6
  • Next milestonePhase 2 commissioning targeted 2027 to 2029
  • Last checked1 November 2026
Source: Ampeak Energy, MeyGen →

What has changed on this project, and when

  • Next milestone: Phase 2 commissioning targeted 2027 to 20292 November 2026 · previously: Redeploy refurbished turbine and advance Phase 2 array build-out (2026-2027)
  • Stage: Operating: Phase 1 (6 MW, four 1.5 MW turbines) since March 2018; Phase 2 (59 MW) awarded CfDs in Allocation Rounds 4 to 62 November 2026 · previously: Operating (Phase 1A): TTG2/TTG4 serviced and back in operation, TTG1 at Nigg for redeployment; >84 GWh produced. Operator rebrand: SAE Renewables is now Ampeak Energy