The Hyperscale
Offtake.
Four hyperscalers signed 80% of the market — and put data centre offtake at the centre of UK renewables.
This is part of the paid GridteamAI Quarterly Sector Report.
£295 single volume · £995/yr annual · Team £2,495 · Enterprise £4,995 · Corporate £9,995. Secure checkout coming soon; email to purchase today.
Four hyperscalers signed 80% of the market — and put data centre offtake at the centre of UK renewables.
In 2025, Amazon (AWS), Google, Meta and Microsoft signed a combined 16,777 MW of corporate renewables contracts globally — approximately 80% of the 20,448 MW total corporate PPA market. The IT sector — overwhelmingly the hyperscale data centre segment — is the principal driver of new corporate renewable procurement.
Amazon has emerged as the largest corporate offshore wind offtaker globally, anchored by its offtake from East Anglia Three (Iberdrola, €5.2 billion / ~£4.4 billion equivalent), with six European offshore wind projects in portfolio. Google entered a 100 MW PPA with Moray West (Scotland), powering the Google Cloud UK region, with delivery from 2025.
The 24/7 Carbon-Free Energy methodology — hourly matching of consumption to carbon-free generation — is materially stricter than annual percentage-RE matching, and is reshaping the product. RE100 tightened its rules from January 2024 (assets <15 years old), reinforcing hyperscale appetite for new-build offshore wind, solar and long-duration storage.
AR7 (8,437.5 MW offshore wind at £91.20/MWh) and AR7a (6,232 MW at £65.23/MWh solar, £72.24/MWh onshore wind) CfD projects sit alongside corporate-PPA-funded projects; many split output across both. CfD provides regulatory price certainty, corporate PPA bilateral certainty — the combination reduces tail risk. Hyperscale PPA growth and CfD allocation growth are positively correlated, not negatively. The UK 2030 target depends on both routes.
European DC PPA volumes fell from 4.2 GW (2024) to 2.6 GW (2025) — a supply-pipeline pause, not a demand retreat. Volumes are expected to recover as new pipeline matures and Round 5 floating wind reaches offtake readiness.
The UK 2030 renewable target is being part-funded by hyperscale corporate offtake on a scale that did not exist before 2022. This is positive for project bankability — but it creates concentration risk, and raises the question of who pays for residual non-hyperscale demand. Policy and market design must work for both routes simultaneously.
The shape of this volume. Section 1 sets out the headline figures. Section 2 develops twelve findings, each confidence-annotated. A chapter-weight pull at p. 14 anchors the argument. Section 3 sets out the buyer class and the named deals. Section 4 develops 24/7 CFE and the CfD interaction. Section 5 isolates concentration risk and emerging products. Section 6 makes recommendations, with a one-page tear-out at p. 25.
Amazon, Google, Meta and Microsoft took ~80% of the corporate PPA market; all other corporate buyers combined took 3,671 MW. The UK hyperscale market runs USD 3.66bn (2025) to 14.52bn (2031).
The hyperscale share (indigo) dwarfs all other buyers (neutral). Hyperscale is now a candidate offtaker for every meaningful UK project.
HIGH — verified against a generator, offtaker, regulator, government department or industry-standard data source. MEDIUM — named industry analytics source cross-referenced to a primary source. LOW — GridteamAI scenario projection or interpretation, marked as such.
Findings 01 – 12 · summary
Findings 01–06 in detail · pp. 11–13 · 07–12 summarised above
S&P Global’s annual review (February 2026) confirmed that Amazon, Google, Meta and Microsoft signed a combined 16,777 MW of corporate renewables contracts in 2025 — approximately 80% of the 20,448 MW market. This is not an emerging trend; it is the established structure of the market. The implication is that the corporate PPA market is now substantially a function of hyperscale demand and supply-chain constraints. Other corporate buyers continue to procure, but at volumes an order of magnitude below hyperscale. For UK renewable developers, "who is your offtaker?" increasingly has hyperscale as a candidate answer; for Government, corporate PPA volumes are a sensitive indicator of hyperscale capital allocation rather than a broad measure of corporate climate ambition.

Amazon’s offtake from East Anglia Three — the €5.2 billion (~£4.4 billion equivalent) Iberdrola / ScottishPower offshore wind project — is the most-cited reference deal for a UK-anchored hyperscale offshore wind PPA. It matters for three reasons: scale (substantial enough to underwrite a major component of a multi-gigawatt project, showing corporate PPAs can complement or replace CfD revenue at project-finance level); counterparty (Iberdrola / ScottishPower is one of Europe’s largest offshore wind developers); and tenor (long enough — typically 12–20 years — to underpin project-finance debt). The six-project Amazon European portfolio suggests a strategic decision to anchor European demand in offshore wind specifically — better load-factor match to baseload, RE100 new-build eligibility, and net-zero alignment.