The AR7
Decode.
Record 14.7 GW awarded across 201 projects, and the strike-price benchmark for UK clean power to 2030.
This is part of the paid GridteamAI Quarterly Sector Report.
£295 single volume · £995/yr annual · Team £2,495 · Enterprise £4,995 · Corporate £9,995. Secure checkout coming soon; email to purchase today.
Record 14.7 GW awarded across 201 projects, and the strike-price benchmark for UK clean power to 2030.
The AR7 + AR7a allocation results (14 Jan / 10 Feb 2026) awarded a record 14.7 GW of clean-power capacity across 201 projects, mobilising an expected £27 bn of private investment. Every technology cleared below its Administrative Strike Price.
Offshore wind — the headline tranche at 8.4 GW — cleared at £91.20/MWh (2024 prices), a 19.29% saving against the £113 cap. Solar cleared a record 4.9 GW at £65.23; onshore 1.3 GW at £72.24; floating offshore wind reached a first material 192.5 MW at £216.49; tidal 20.9 MW at £265.00.
Delivery is England-heavy in solar and offshore, Scotland-dominated in onshore, and Welsh-led in floating and tidal. Twelve offshore-wind CfD units across eight named sites form the 2028–2031 backbone. AR7 + AR7a delivers ~6.5–7.4% of the Clean Power 2030 envelope from one round.
By delivery, the AR7 + AR7a cohort commissions across 2027/28–2032/33; budget impact rises to £1,784m on offshore Pot 3 by 2032/33; the named twelve offshore units carry the bulk of the capacity; and AR8 design resets strike-price expectations to AR7 clearing levels.
The shape of this volume. Section 1 sets out the headline figures. Section 2 develops twelve findings, each confidence-annotated. A chapter-weight pull at p. 14 anchors the argument. Section 3 sets out the AR7 architecture — Pots, pay-as-clear and the 15-year strike price. Section 4 maps the named project portfolio. Section 5 covers budget impact and regional distribution. Section 6 makes recommendations, with a one-page tear-out at p. 25.
£27 bn expected private investment; AR7 8,437.5 MW (offshore + floating), AR7a 6,232.1 MW (solar + onshore + tidal).
The three moss headline panels carry the totals; the technology breakdown table sits below. Offshore wind is the headline tranche at 8.2 GW.
HIGH — verified against a NESO, Ofgem, DNO or DESNZ primary source. MEDIUM — named UK industry coverage cross-referenced to a primary source. None is forward-looking opinion unless framed as such.
Findings 01 – 12 · summary
Findings 01 – 09 follow in detail · pp. 10 – 14 · 10 – 12 summarised on the matrix
Dogger Bank South East and South West (RWE, 1,500 MW each, 2030/31); Norfolk Vanguard East and West (six CfD units, ~3,090 MW, 2028/29–2029/30); Berwick Bank Phase B (Scotland, 1,380 MW); Awel y Môr A (Wales, 775 MW); plus floating Erebus and Pentland. Twelve contract units across eight sites (six fixed-bottom + two floating) — the named backbone of UK offshore delivery, interacting with EGL transmission (Gap 11) and Welsh seabed leasing (Gap 16).
Pot 3 offshore wind cleared at £91.20/MWh (2024 prices); Scotland-specific offshore at £89.49/MWh; Pot 3 total 8,245 MW, plus 192.5 MW floating (Pot 4) = 8,437.5 MW. The 19.29% saving against the £113/MWh Administrative Strike Price reflects a matured strike-price band around £89–91/MWh — global supply-chain pressure on cable, vessels and turbines (Gap 11) against the value of CfD revenue stabilisation.
4,905.01 MW across 157 successful projects (72 delivering 2027/28, 85 in 2028/29), a 13.03% saving against the £75/MWh Administrative Strike Price. Heavily England-concentrated: 4,247 MW (86.6%); Scotland and Wales ~330 MW each. West Burton (three sites, 480 MW) is the largest single cluster. Structurally significant for the wider UK solar pipeline (Gap 10).