The Action Brief
§ The Action Brief · Gap 35
PR24 Final Determinations: The £104bn Envelope, Five CMA Appeals and the Thames Water Test
The Action Brief — for the boardroom, not toward it.
§ THE FINDING
Ofwat issued PR24 Final Determinations in December 2024, setting the regulatory framework for the eleven English + Welsh water and sewerage undertakers over the 2025-2030 control period. The total expenditure envelope of approximately £104 billion is materially larger than the equivalent PR19 settlement, reflecting enhanced storm overflows and sewage treatment requirements (Gap 38 cross-ref, £88bn-equivalent across multiple control periods), leakage reduction performance commitments, drought resilience strategic resource options (Gap 37 cross-ref), and cumulative water industry under-investment requiring catch-up. Five companies were referred by Ofwat to the Competition and Markets Authority on 18 March 2025: Anglian Water, Northumbrian Water, South East Water, Southern Water, and Wessex Water. Thames Water requested a CMA reference but agreed with Ofwat to defer the formal reference by up to 18 weeks. CMA Provisional Findings issued through 2025; Final Determinations through 2025-2026. Customer bills rose materially — average household bill increases over 2025-2030 are the largest in recent UK water industry history. Enhanced performance commitments cover storm overflows, leakage reduction, drought resilience, customer service, biodiversity and nature-based solutions, and net-zero emissions. The Thames Water financial position — ownership structure, financial covenants, debt levels, restructuring efforts, sustainability of operating model — has been the single most consequential UK water industry issue of the PR24 cycle. Scottish Water and NI Water operate under separate public-utility regulatory regimes (Gap 42 cross-ref) outside PR24. The strategic implication for boards is that PR24 is the regulatory framework that will determine whether UK water industry delivers a step-change in performance and investment over 2025-2030, or whether the financial and political challenges of Thames Water and the wider sector materially constrain the framework's effectiveness — with PR29 design consultation through 2027-2028 the next structural commercial cycle.